- Product Categories
- Square Cooling Tower
- Round Cooling Tower
- Open closed cooling tower
- FRP industrial cooling tower
- Other cooling tower accesso..
- Friendly Links
| Information Name: | How Hubei cooling tower maintenance |
| Published: | 2015-05-30 |
| Validity: | 365 |
| Specifications: | |
| Quantity: | 12.00 |
| Price Description: | |
| Detailed Product Description: | Hubei tower how repair? Cooling Tower Maintenance: cooling tower maintenance process in three stages, namely cleaning and maintenance after shutdown, check the debug boot before the official start of the operation of the inspection checks. (A) cooling tower down after cleaning, maintenance 1, the bulk water system ① Check the cooling tower water mains, distribution tubes, nozzles without damage loose, timely repair when the line fixed. The elimination of the water distributor and dirt inside the nozzle to ensure water flow, water distribution uniformity sprinklers. ② Rinse thoroughly cooling tower water tray and water filter cover to prevent dirt accumulation scale clogging pipes. Should open the drain valve cleaning is completed, put the best water in the water tray to avoid freezing. ③ check the water tray, whether foot tower leaks, such as tainted point, timely glue. 2, the cooling system to clean the tower all exchanger ① material (filler), completely removed the dirt scale hot metal surface, between the holes, ensure clean heat transfer material. Replace line repair material while working on the heat exchanger. Note that when laying closely packed, leaving no gap. ② clean block curtain, silencers blanket to remove dirt. To repair damage at the replacement. Laying claim block when the curtain close, to prevent leaching. The cooling tower filled with water, check for leaks (especially the tower junction), if the leak replace the seals. 3. Transmission ① Motor: Check motor terminals is intact, the motor rotation is normal, the motor connected wire box for sealing, lubrication motor bearings, motor shell repainted. Long-term shutdown, suggest that the owners run for at least a month motors three hours, keeping the motor coil dry and lubricate the bearing surfaces. ② Reducer: Check reducer rotation is normal, if different sound, immediately replace gear bearing. ③ belts, pulleys: Adjust the top wire, loosen the belt and extend belt life. Check the belts for damage, cracks, if necessary, suggest that the owners replace the belt. Check pulleys, motor frame level, tighten loose bolts, rusted bolts be replaced. ④ fan: cleaning blade surface dirt, check the blade angle, blade and wind trunk space, and make adjustments. 4, the appearance of the tower for wind ① torso, tower, into the wind guide thoroughly cleaned to ensure clean aesthetic appearance. ② re-tighten all parts of bolts and replace rusted bolts. |
Admin>>>
You are the 17989 visitor
Copyright © GuangDong ICP No. 10089450, Jiangxi Xin Cooling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 17989 visitor
Copyright © GuangDong ICP No. 10089450, Jiangxi Xin Cooling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
| No.13670527

