- Product Categories
- Square Cooling Tower
- Round Cooling Tower
- Open closed cooling tower
- FRP industrial cooling tower
- Other cooling tower accesso..
- Friendly Links
| Information Name: | Ganzhou Xin cooling tower cooling tower company |
| Published: | 2015-04-21 |
| Validity: | 365 |
| Specifications: | Complete |
| Quantity: | 1.00 |
| Price Description: | |
| Detailed Product Description: | Ganzhou Xin cooling tower cooling tower cooling tower company is set aerodynamics, thermodynamics, fluid, chemistry, biochemistry, materials science, static and dynamic structural mechanics variety of disciplines, and processing technology as one integrated product. Water quality is a function of more variables, cooling is multifactorial, multi-variable and multi-effect integrated process. Cooling tower water and air by the relative flow situation is different, different types of cooling towers superior, inferior, cooling tower industry in the academic debate on the long-term issues, this debate has effectively promoted the development of the cooling tower technology, each in the debate weaknesses, so that the cooling tower technology continues to improve, to save energy, improve efficiency, reduce investment objective of continuous technological progress. Cooling tower installation, commissioning, use Notes: 1, on the basis of this specification and Mounting Dimensions for installation reference. Access to water in the direction of small counterflow tower can be arbitrarily selected in a horizontal position, but not collision foundation. Middle base, the load should be re-run 25% and the remaining 75% of the average paid by a rectangular perimeter foundation, roof installation should be considered as an additional load caused by pressure. 2, cooling towers and access to water connections should be located at the bracket to prevent excessive weight on the tower wall. 3, the fan blades in the installation, adjustment should be made prior to use, maintain consistent angle. Method for adjacent mesenchymal 150 mm at the front and rear edges of each blade of the two respectively, for a flag, and then measuring the distance between the front and rear edges of each blade are represented by bracket lower chord, in order to calculate the respective front and rear edges of the blades which point high poor, by making several adjustments to achieve the consistent elevation is qualified. 4, after the electrical wiring must be sealed junction box, and note the current test does not exceed a given motor load current. 5, be sure to open when the pump starts after opening the cooling tower fan, is not allowed without the watering of the fan operation, the fan can be short-term low-speed reverse extinction of ice. 6, reducer oiling before use, can be anti-wear No. 50 gear oil or oil lubricated, first 100-300 hours of operation should be renewed oil after an oil change once every hour operation 3000-5000. The oil level should be moderate, oil standard should be easy to observe. 7, when the cooling tower operation, there should be someone to manage, always pay attention to current changes in water temperature, motor, reducer, water distribution, etc. should be checked regularly. |
Admin>>>
You are the 17989 visitor
Copyright © GuangDong ICP No. 10089450, Jiangxi Xin Cooling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 17989 visitor
Copyright © GuangDong ICP No. 10089450, Jiangxi Xin Cooling Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
| No.13670527

